BED PREPARATION

Constructing brick lined beds of 1.0 to 1.5 meter width and 0.25 to 0.3 meter height.

BED INSTALLATION

Spreading agricultural wastes and cow dung in gradually built-up shallow layers.

EARTH WORMS

Earthworms should be introduced in between the layers at the rate of 350 to 360 worms per m3

BED PROTECTION

These beds should be covered properly to protect it from Sun & rain.

BED MANAGEMENT

Sprinkling water over the beds to Maintained temperature 21-30°C & Moisture 40-50%.

VERMICOMPOST HARVESTING

Collection of compost from top layers gradually and sieved in two mm sieve.