Search
SEARCH
0 items
₹
0.00
info@speedcontractfarming.com
Facebook Profile
Twitter Profile
Instagram Profile
Youtube Profile
LinkedIn Profile
0
No products in the cart.
Home
About Us
Portfolio
Gallery
Shop
Contact Us
SignIn
Register
Farm
Home
Archive by "Farm"
BED PREPARATION
BED PREPARATION
Constructing brick lined beds of 1.0 to 1.5 meter width and 0.25 to 0.3 meter height.
Read More
EARTH WORMS
EARTH WORMS
Earthworms should be introduced in between the layers at the rate of 350 to 360 worms per m3
Read More
BED PROTECTION
BED PROTECTION
These beds should be covered properly to protect it from Sun & rain.
Read More
VERMICOMPOST HARVESTING
VERMICOMPOST HARVESTING
Collection of compost from top layers gradually and sieved in two mm sieve.
Read More
copyright@speedcontractfarming 2024-25
Terms of Use
Privacy Policy